cubicles in tech support in place
26 November 2009 |
glass in outside door
exit button visible to right
26 November 2009 |
UPS disconnect and circuit panel
get conduit for wires
26 November 2009 |
overhead studs for ceiling drywall
26 November 2009 |
insullation started in addition
26 November 2009 |
decorative bulkhead over boardroom table
26 November 2009 |
mop sink in closet
26 November 2009 |
toilet, sink and light fixture
installed in washroom
27 November 2009 |
doors arrive and await installation
27 November 2009 |
decorative bulkhead with lights plastered
27 November 2009 |
detail on sink and faucett
27 November 2009 |
built in shelves in mop room
27 November 2009 |
sink and faucet in kitchen
30 November 2009 |
starting to hang the doors
30 November 2009 |
ceiling, lights and carpeting
in customer service area
30 November 2009 |