![exit signs installed](Thumbnails/76.jpg) exit signs installed
20 November 2009 |
![electrical pulled through floor conduit](Thumbnails/77.jpg) electrical pulled through floor conduit
20 November 2009 |
![finishing the floor tile at staff entrance](Thumbnails/78.jpg) finishing the floor tile at staff entrance
20 November 2009 |
![pot lights in board room ready to be put in place](Thumbnails/79.jpg) pot lights in board room ready to be put in place
20 November 2009 |
![concrete block and cement arrive for garbage containment area](Thumbnails/80.jpg) concrete block and cement arrive
for garbage containment area
20 November 2009 |
![work progresses on garbage containment area](Thumbnails/81.jpg) work progresses on garbage containment area
23 November 2009 |
![main entrance with facade nearing completion](Thumbnails/82.jpg) main entrance with facade nearing completion
23 November 2009 |
![reception upper curved wall studding finished](Thumbnails/83.jpg) reception upper curved wall studding finished
23 November 2009 |
![new circuit panel (left) for heating /cooling units](Thumbnails/84.jpg) new circuit panel (left) for heating /cooling units
23 November 2009 |
![water meter installed](Thumbnails/85.jpg) water meter installed
23 November 2009 |
![door frames with side-lights installed](Thumbnails/86.jpg) door frames with side-lights installed
23 November 2009 |
![tile work continues in bathrooms](Thumbnails/87.jpg) tile work continues in bathrooms
23 November 2009 |
![tile work continues in bathroom](Thumbnails/88.jpg) tile work continues in bathroom
23 November 2009 |
![tech support with centre lighting in place](Thumbnails/89.jpg) tech support with centre lighting in place
23 November 2009 |
![bulkhead in server room raised for additional space](Thumbnails/90.jpg) bulkhead in server room raised
for additional space
23 November 2009 |