tile work commences
tile work commences
11 November 2009
back board in server room
back board in server room
11 November 2009
tile down to staff entrance
tile down to staff entrance
11 November 2009
tile down in hall between tech support and kitchen
tile down in hall between tech support and kitchen
11 November 2009
bulkheads with diffusers in place
bulkheads with diffusers in place
11 November 2009
ledger for exterior finish attached
ledger for exterior finish attached
11 November 2009
starting to close in the addition
starting to close in the addition
12 November 2009
starting to close in the addition
starting to close in the addition
12 November 2009
more clearing at back of lot
more clearing at back of lot
12 November 2009
preparing a pad to move the containers on to
preparing a pad to move the containers on to
12 November 2009
getting the stud wall bases laid out and installed
getting the stud wall bases laid out and installed
12 November 2009
getting the stud wall bases installed
getting the stud wall bases installed
12 November 2009
canopy over main entrance
canopy over main entrance
13 November 2009
inside wall studs started in addition
inside wall studs started in addition
13 November 2009
tile flooring continues in hall way
tile flooring continues in hall way
13 November 2009