![base for garbage bin setting up](Thumbnails/61.jpg) base for garbage bin setting up
16 November 2009 |
![parking lot and back of lot from roof](Thumbnails/62.jpg) parking lot and back of lot from roof
16 November 2009 |
![mock-up of bathroom tile](Thumbnails/63.jpg) mock-up of bathroom tile
17 November 2009 |
![windows installed in addition](Thumbnails/64.jpg) windows installed in addition
17 November 2009 |
![door frames installed](Thumbnails/65.jpg) door frames installed
17 November 2009 |
![most of studs are in place in addition](Thumbnails/66.jpg) most of studs are in place in addition
17 November 2009 |
![continuting to work on the architectural feature](Thumbnails/67.jpg) continuting to work on the architectural feature
19 November 2009 |
![data cables along newly installed overhead rack](Thumbnails/68.jpg) data cables along newly installed overhead rack
19 November 2009 |
![conduit holes cemented](Thumbnails/69.jpg) conduit holes cemented
19 November 2009 |
![pressure testing water lines in addition](Thumbnails/70.jpg) pressure testing water lines in addition
19 November 2009 |
![bulkhead being painted white](Thumbnails/71.jpg) bulkhead being painted white
19 November 2009 |
![patio stone walkway on roof to protect surface](Thumbnails/72.jpg) patio stone walkway on roof to protect surface
19 November 2009 |
![landscaping rocks](Thumbnails/73.jpg) landscaping rocks
19 November 2009 |
![continuing work on the facade of the addition](Thumbnails/74.jpg) continuing work on the facade of the addition
20 November 2009 |
![studs for reception upper curved wall](Thumbnails/75.jpg) studs for reception upper curved wall
20 November 2009 |