base for garbage bin setting up
base for garbage bin setting up
16 November 2009
parking lot and back of lot from roof
parking lot and back of lot from roof
16 November 2009
mock-up of bathroom tile
mock-up of bathroom tile
17 November 2009
windows installed in addition
windows installed in addition
17 November 2009
door frames installed
door frames installed
17 November 2009
most of studs are in place in addition
most of studs are in place in addition
17 November 2009
continuting to work on the architectural feature
continuting to work on the architectural feature
19 November 2009
data cables along newly installed overhead rack
data cables along newly installed overhead rack
19 November 2009
conduit holes cemented
conduit holes cemented
19 November 2009
pressure testing water lines in addition
pressure testing water lines in addition
19 November 2009
bulkhead being painted white
bulkhead being painted white
19 November 2009
patio stone walkway on roof to protect surface
patio stone walkway on roof to protect surface
19 November 2009
landscaping rocks
landscaping rocks
19 November 2009
continuing work on the facade of the addition
continuing work on the facade of the addition
20 November 2009
studs for reception upper curved wall
studs for reception upper curved wall
20 November 2009